Our new hardware setup

Photo of the new serversAfter our latest purchase with Dell, all I can say is that Micheal Dell will be able to buy a nice new watch. Currently in the office we have a stack of new machines that are getting close to being fully configured ready for the move to the data center. If anyone is looking for a collocation facility in the Atlanta, Georgia area I would highly recommend Quality Tech. Quality Tech is the former E-Delta Com and have a really cool data center in Suwanee, which will be the home to our new boxes. We ended up with the following combination of servers:

  • 7 - Poweredge 860
    • 2 - LVS
    • 2 - WWW
    • 2 - NFS
      • Director, Slave configuration using hearbeat
      • Replicate Data in real time with DRBD to allow for hot failover
      • Will also serve web traffic at half of the ratio compared to the WWW boxes
    • 1 - DEV
  • 3 - Poweredge 2950
    • 2 - DB (MySQL dual master configuration)
    • 1 - Backup Master with alot of storage space
  • 1 - Poweredge SC430
    • data set compilation, mostly sits idle
  • 1 - Clone Machine
    • Old Backup server, will become backup slave